$1,365.00
DC-Operated, Long-Stroke, Capitve Guided Armature, ± 2VDC Output (± 8.0in), (± 200mm)
Lead Time: 4-6 Weeks
Captive Guided Armature
V – DC
( ± 8.0 in), ( ± 200 mm)
± 2.2 V
± 0.50%
Datasheet: DSD1000LC2 – DSD37000LC2 datasheet.pdf
Discover the world of GMC INSTRUMENTS - CLICK on the brand logos below